Effect of land-use change on traffic peak hour factor

dc.contributor.authorPhahlane, Motsepe Herbert
dc.contributor.co-supervisorSalim, W. R., Dr.
dc.contributor.supervisorNdambuki, J. M., Prof.
dc.date.accessioned2019-09-04T21:58:25Z
dc.date.available2019-09-04T21:58:25Z
dc.date.issued2012-01
dc.descriptionM. Tech. (Department of Civil Engineering and Building, Faculty of Engineering and Technology), Vaal University of Technology.en_US
dc.description.abstractGrowth in land development in South Africa resulted in large increase in traffic volumes. A Traffic Impact Assessment (TIA), as a traffic engineering tool, is commonly used to assess the possible effects of a land development project on the transportation and traffic system. During the TIA process, capacity analysis is performed to indicate the measures of effectiveness of the intersection. Intersection capacity analysis in South Africa by engineers is done on the basis of default values of the Peak Hour Factor (PHF) provided by the Highway Capacity Manual (HCM) or limited traffic counts. However, the default value of PHF may be significantly affected by new developments in the neighbourhood of the intersection. This study aimed at investigating the impact land-use change has on the existing intersection PHF, thus predicting values per land-use type. Intersections with traffic counts conducted before and after land-use change in vicinity were selected and investigated. The results showed that change in land-use has an impact on the existing PHF. They also assist in identifying the appropriate intersections to predict the PHF per land-use type. Intersections were identified and analysed, and this led to the development of a design chart showing the predicted PHF per land-use type selected and measures to consider during traffic analysis. Intersection capacity analysis was performed to compare the results using the predicted PHF and the HCM default values. The results showed that traffic flow rate was adjusted by up to 26% when using the default values, 0.92 and 0.95. The results also showed that the default values could overestimate the volume to capacity ratio and the average delay by up to 15% and 35%, respectively. It was then concluded that the use of HCM default values of the PHF for every land-use type will have an effect of the final roadway design results. The computed PHF values for each land-use type were then recommended to be used to ensure fairness and consistency in traffic analysis.en_US
dc.identifier.urihttp://hdl.handle.net/10352/385
dc.language.isoenen_US
dc.publisherVaal University of Technologyen_US
dc.subjectTransportationen_US
dc.subjectLand-useen_US
dc.subjectTraffic impacten_US
dc.subject.lcshLand use -- South Africa.us_US
dc.subject.lcshTransportation.en_US
dc.subject.lcshDissertations, Academic -- South Africa.en_US
dc.titleEffect of land-use change on traffic peak hour factoren_US
dc.typeThesisen_US
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
MH Phahlane complete Dissertation.pdf
Size:
6.96 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
2.02 KB
Format:
Item-specific license agreed upon to submission
Description: